Bar Harbor Story reported that the Bar Harbor Planning Board reviewed three separate projects for completeness on November 4, determining whether the proposals met town rules before future compliance reviews.
At the Route 3 campground in the Ireson Hill area, developers hope to relocate and upgrade forty-seven tent sites into full-service RV sites while connecting twenty-three existing sites to wastewater systems. Planning Director Michele Gagnon told the board that the technical review team did not require a further technical review. The project lacked some capacity letters and will face a public hearing on December 2.
The board also reviewed a subdivision modification for McFarland Farm on Eden Farm Road in Salisbury Cove, which reduces the size of multiple unsold lots. Neighbors raised questions about a vernal pool and the future of the empty lots. Deemed incomplete for missing capacity letters and a notice of no previous violation, it heads to a December 2 public hearing.
Finally, the Russell Farm subdivision on Russell Farm Road near McFarland Hill was reviewed to divide a thirteen-point-four-nine-acre parcel into two lots, with an existing house on the larger lot and five accessory structures on the smaller one. Like the others, it was deemed incomplete and scheduled for a public hearing on December 2.
Additionally, the board approved a property merger for Explore Acadia on Route 3, allowing the O'Connell family to convert a short-term rental dwelling unit into a guest unit, bringing its total guest units to fourteen.





